Narrow ditches had to be dug for the electricity lines for the landscape lighting. Ditches also had to be dug for water lines to the east side of our driveway. I'm so grateful for Mike's knowledge and skills in doing all of these projects!
I'm also grateful for good contractors and workers who came to build our new retaining wall; remove the gravel from our driveway; and prepare the ground for the cement to be poured.
 |
This is a BIG driveway We had half of the driveway poured and then the other half |
 |
Beautiful wet cement driveway!
|
 |
This is the RV pad and curved sidewalk (below) to the shed after the gravel was removed in preparation for cement to be poured |
 |
The driveway on the east side of our property prepared for cement |
 |
New driveway on west side of our property after it dried
|
 |
More ditches and a new drip line |
When we moved into our home last November, the first project we had done was to covert the pergola over the existing patio into a larger covered patio
 |
We added two Heavenly Bamboo shrubs to the back garden area
|
 |
We also added these English Lavender shrubs behind the gas grill
|
 |
More plants were added, including a Japanese Azalea below
|